There are altogether 12 chimneys of about 40m high
in this 1,943MW CCGT(Combine Cycle Gas Turbine) Power Plant
Of which 3 chimneys from GB3(new Phase) are dummy and are not in used.
There are 9 set of Alstom 13E2 Gas Turbine Generator
and 3 set of steam turbine Generator
in the plant running on gas and diesel as standby fuel.
The LPP is situated by the seaside in Segari,Perak
nearby to the town of Pantai Remis.



These ex-tin mine lake forms a natural fence and added a nice scenery to the power plant
besides the straits of Malacca on the other side.

Beach front view

A view from the club house

Sunset by the lake
MalakoffView Lumut Power Plant in a larger map