These five chimneys of
Putrajaya Power Station formerly known as Serdang Power Station
are about 50m high.
The Gas Turbines used here are 2x John Brown GE FR9E(110mw each) and 3x Siemens V94.2(135mw each) with a total generating capacity of 625mw,
build in 1993 after the national blackout,this is a
peaking power plant
to cater to peak demands during the daytime.
The three Siemens Gas Turbine chimneys.
and the two John Brown GE GT chimneys,decommissioned.
The admin office with the chimneys in the background.
View Putrajaya Power Station in a larger map