is situated at Kampung Tanjung Bangkung in Malim Nawar,Perak.
It was build during the Japanese Occupation time and there is a base of another chimney
beside it which was never completed because of their sudden surrender.
The chimney is circular in shape,6m diameter at the base and about 3m on top with 4 arches.
The other remnant of the factory is a part of the fencing.
There is 3oomm diameter hole here.
The base of the other chimney.
This black coloured rock looks like some left over carbide.
A signboard in the village.
Part of the factory fencing.
Monday, December 14, 2009
Colonial House Chimneys of Malim Nawar Power Station staff quarters
The old staff quarters of Malim Nawar Power Station build in late 40s by the Perak River Hydro-electric company
after the second world war is still standing strong after 60 years,
thanks to the brick,concrete and high quality wood being used during its construction.





Utilities in Malaya 1966-70 pdf
after the second world war is still standing strong after 60 years,
thanks to the brick,concrete and high quality wood being used during its construction.
Utilities in Malaya 1966-70 pdf
Subscribe to:
Posts (Atom)