These eight chimneys of about 40m high are of Teluk Gong Power Station in Malacca which consist of 4x 110mw GE Fr9 Gas Turbine and 2x 230mw V94.3 A2 Siemens GT and 1x 260mw Siemens K-series Steam Turbine with a total generating capacity of 1060mw.
These four chimneys of about 40m high are of Tanjung Kling Power Station in Malacca. It is a Combined Cycle Power Plant with a capacity of 330mw running on 2x GE Fr9 Gas Turbine,2 Heat Recovery Boiler and a GE steam turbine.
The main entrance of the plant.
The old main water intake of the old Tanjung Kling Power Station which is already being demolished.