These 16 chimneys of about 35 to 40m high are from 4 blocks of CCGT,
3 blocks are running on 6X95MW Alsthom GE Fr9 Gas Turbine with 3X 102MW Toshiba Steam Turbine and another one on 2X 90 MW ABB 13D Gas Turbine with an Ansaldo 100MW Steam Turbine
giving an installed capacity of 1156MW.
The Alsthom GE Fr9 CCGT block.
This is the CCGT running on 2 Alstom ABB 13D Gas Turbine