The single flare stack chimneys of Murphy's Bintulu Onshore Receiving Facility
is about 40m high.
This new facility will process the natural gas taken from offshore Sarawak fields
before it is transfered to MLNG Bintulu to be liquidfied.
The beach beside the Murphy plant.
Murphy oil
Monday, June 21, 2010
Tuesday, June 8, 2010
Chimneys of Tanjung Kidurong Power Station
The 10 chimneys of Tanjung Kidurong Power Station in Bintulu are between 25 to 40m high.
There are from 6 open cycle GE Frame 6 Gas Turbine (6 x 34MW)
and a new combined cycle block consisting of 2 GE Frame 9 GT(2 x 110MW) and a steam turbine generator(110MW) giving a total installed capacity of 534MW.
This building housed 4 GE frame 6 GT.
There are another 2 more similar machine of package outdoor type
in the power station.
The new 330MW Combined Cycle Bintulu Power Station.
SESCO Transmission Info Booklet
Jobs in Sarawak Energy
Chinese Power Plant in Malaysia
There are from 6 open cycle GE Frame 6 Gas Turbine (6 x 34MW)
and a new combined cycle block consisting of 2 GE Frame 9 GT(2 x 110MW) and a steam turbine generator(110MW) giving a total installed capacity of 534MW.
This building housed 4 GE frame 6 GT.
There are another 2 more similar machine of package outdoor type
in the power station.
The new 330MW Combined Cycle Bintulu Power Station.