The two chimneys of about 25m high
from 2 x GEC Alsthom Frame 6B Gas Turbine
capable of supplying 64MW of electricity
running on distilate fuel due to unavailability of gas
in east coast Sabah
no thanks to the scraping of the Lahat Datu Regasification terminal project.
A machine with a colorful past
after one of the 2 barges ferrying the equipment from Telok Ewa,Langkawi
was hijacked by pirates mid April 2012.
Dailyexpress.com.my/news.