Tuesday, April 27, 2010

South wing Chimneys of Bintulu's abandoned brick kiln

The south wing kiln chimneys are of similar height as the earlier one,
that is two 9m and a 5m chimney.
I only found it on my third visit to the site as it was almost covered by bushes.
This is the production part of the brick factory with raw materials,
brick making machinery and storage area..

















Unfired bricks.



The brick storage area.



The brick making area.



Beltings running the machines.



Clay storage.







This diesel engine which turns the belting.


















View South wing of Bintulu abandoned brick kiln in a larger map

Thursday, April 15, 2010

Chimneys of Teluk Gong Power Station

These eight chimneys of about 40m high are of Teluk Gong Power Station in Malacca
which consist of 4x 110mw GE Fr9 Gas Turbine and 2x 230mw V94.3 A2 Siemens GT
and 1x 260mw Siemens K-series Steam Turbine
with a total generating capacity of 1060mw.


View of the plant at sunrise












Night view




View from Pulau Konet.

Tuesday, April 6, 2010

Bintulu Sebiew Road Abandoned Brick kiln

This two 5m high Brick Klin Chimneys of an abandoned brick klin
is behind a housing estate on Sebiew Road
and will be demolished very soon.


















A rare view inside the brick chimney.

















A pitcher plant growing beside the chimney.



A view inside the kiln.


Clay,raw material for brick making is in abundance here.










View Sebiew Rd abandoned Brick Klin Chimneys in a larger map

Thursday, April 1, 2010

Chimneys of Tanjung Kling Power Station

These four chimneys of about 40m high are of Tanjung Kling Power Station
in Malacca.
It is a Combined Cycle Power Plant with a capacity of 330mw
running on 2x GE Fr9 Gas Turbine,2 Heat Recovery Boiler and a GE steam turbine.





The main entrance of the plant.













The old main water intake of the old Tanjung Kling Power Station
which is already being demolished.







View Tanjung Kling Power Station in a larger map


Pahlawan Power