The south wing kiln chimneys are of similar height as the earlier one,
that is two 9m and a 5m chimney.
I only found it on my third visit to the site as it was almost covered by bushes.
This is the production part of the brick factory with raw materials,
brick making machinery and storage area..
Unfired bricks.
The brick storage area.
The brick making area.
Beltings running the machines.
Clay storage.
This diesel engine which turns the belting.
View South wing of Bintulu abandoned brick kiln in a larger map
Tuesday, April 27, 2010
Thursday, April 15, 2010
Chimneys of Teluk Gong Power Station
Tuesday, April 6, 2010
Bintulu Sebiew Road Abandoned Brick kiln
This two 5m high Brick Klin Chimneys of an abandoned brick klin
is behind a housing estate on Sebiew Road
and will be demolished very soon.
View Sebiew Rd abandoned Brick Klin Chimneys in a larger map
is behind a housing estate on Sebiew Road
and will be demolished very soon.
View Sebiew Rd abandoned Brick Klin Chimneys in a larger map
Thursday, April 1, 2010
Chimneys of Tanjung Kling Power Station
These four chimneys of about 40m high are of Tanjung Kling Power Station
in Malacca.
It is a Combined Cycle Power Plant with a capacity of 330mw
running on 2x GE Fr9 Gas Turbine,2 Heat Recovery Boiler and a GE steam turbine.
The main entrance of the plant.
The old main water intake of the old Tanjung Kling Power Station
which is already being demolished.
View Tanjung Kling Power Station in a larger map
Pahlawan Power
in Malacca.
It is a Combined Cycle Power Plant with a capacity of 330mw
running on 2x GE Fr9 Gas Turbine,2 Heat Recovery Boiler and a GE steam turbine.
The main entrance of the plant.
The old main water intake of the old Tanjung Kling Power Station
which is already being demolished.
View Tanjung Kling Power Station in a larger map
Pahlawan Power