This 10m high Brick Sawdust Burner chimneys of Bukit Emas Sawmill
is situated at Lipis Road, Raub.
While this 4m high brick sawdust Burner Chimney
of Kit Ming Sawmill on the same road
is already abandoned probably due to shortage of logs.
Wednesday, March 24, 2010
Sunday, March 14, 2010
Chimneys of Kuala Langat Power Plant
The 6 chimneys of Genting Sanyen Kuala Langat Power Plant
which are about 40m high is of a Combined Cycle Plant
with a CC block of 3x Alstom 13E2M Gas Turbine,3 Boilers and a Steam Turbine
and another CC block of a Hitachi Frame 5 GT,a Kvaerner Frame 6 GT and a Boiler
with a total generating capacity of about 720mw of power.
This is the dummy chimney i was talking about
which is similar to the ones in Lumut Power Plant,
the reason for it was the acute power shortages after the 1993 blackout in peninsular Malaysia, since the GT was able to be commisioned much earlier than the steam turbines
an elbow was first installed after the GT to divert the exhaust flow up the chimney while waiting for the completion of the rest of the Combine Cycle facility.
The elbow then was replaced by a straight plenum to the Boilers
thus leaving 3 dummy chimneys in a CC block.
The 3 unused elbow.
View Kuala Langat Power Plant in a larger map
which are about 40m high is of a Combined Cycle Plant
with a CC block of 3x Alstom 13E2M Gas Turbine,3 Boilers and a Steam Turbine
and another CC block of a Hitachi Frame 5 GT,a Kvaerner Frame 6 GT and a Boiler
with a total generating capacity of about 720mw of power.
This is the dummy chimney i was talking about
which is similar to the ones in Lumut Power Plant,
the reason for it was the acute power shortages after the 1993 blackout in peninsular Malaysia, since the GT was able to be commisioned much earlier than the steam turbines
an elbow was first installed after the GT to divert the exhaust flow up the chimney while waiting for the completion of the rest of the Combine Cycle facility.
The elbow then was replaced by a straight plenum to the Boilers
thus leaving 3 dummy chimneys in a CC block.
The 3 unused elbow.
View Kuala Langat Power Plant in a larger map
Friday, March 5, 2010
Boiler Chimneys of SH Wood Trading.
This two 18m high boiler chimney is of a rubber wood dryer or treatment plant in Temerloh ,Pahang.
There are a few brick kiln at the factory used for drying of rubber wood.
The small boiler at the factory that i am not sure of its purpose
but most probably it is used for treatment of the rubber or other wood.
View Boiler Chimneys of SH Wood Trading in a larger map
There are a few brick kiln at the factory used for drying of rubber wood.
The small boiler at the factory that i am not sure of its purpose
but most probably it is used for treatment of the rubber or other wood.
View Boiler Chimneys of SH Wood Trading in a larger map